Installation & setup

From the pallet to first use, one step at a time

Most of what we sell is ready to go within an hour of the truck leaving. A lift takes a weekend and a helper. Pick your machine below for a plain-English walkthrough, see what tools to have on hand, and if you would rather not do it yourself, we can send someone who does this every week.

Step-by-step guides Phone help included Warranty stays intact Pro install available
Read this first
Read the manufacturer's manual cover to cover before you pick up a tool. The manual wins over anything on this page.
Never get under a raised lift or forklift mast that is not resting on its mechanical locks or a rated stand. Hydraulics alone are not a safety device.
Electrical hookups for lifts, tire machines and pool heat pumps go to a licensed electrician, to local code. A wrong-wired 220V circuit voids the warranty and can hurt you.
Wear eye protection, gloves and closed-toe boots, and keep kids, pets and helpers who are not helping out of the work area.
Check every fluid and torque every fastener the manual lists before the first start. Freight trucks loosen what the factory tightened.
If any step is beyond your tools, skills or comfort, stop and call Hannah at (706) 431-7885. A 10-minute call is cheaper than a mistake.
Setup guides by machine

What did you get?

Two-post liftAtlas, BendPak, Tuxedo, Triumph, Amgo and Katool two-post lifts, 9,000 to 12,000 lb
Time 6–10 hrsPeople 2–3Skill Advanced
1
Check the floor and the space

You need at least 4 inches of 3,000 PSI concrete, cured 28 days or more, with no cracks, seams or expansion joints inside the post footprint. Confirm ceiling height (12 feet for most two-post lifts), and a 220V circuit within reach of the power unit. Run the garage checklist further down this page before you open the crate.

Not sure how thick the slab is? Drill a 1/4" test hole where a post will sit and measure with a bent wire.
2
Mark out the posts

Unpack, check every part against the packing list, and read the layout drawing. Chalk the centerline of the bay, measure the post spacing from the manual (usually 132 to 145 inches inside to inside), and square it up by matching the diagonals to within 1/8 inch. Mark every anchor hole through the base plates.

3
Stand the posts and anchor them

Raise the power-side post first with two helpers or an engine hoist, then the other. Drill the anchor holes with a rotary hammer and the bit size the manual calls for (usually 3/4"), blow out the dust and drive the wedge anchors. Shim under the base plates until each post is plumb both ways, then torque the anchors to spec, commonly 85 to 150 ft-lb. Never grind the floor to level a post.

Plumb matters more than level. A post 1/4" out of plumb loads the arms unevenly.
4
Cables, hydraulics and power

Mount the power unit, connect the hydraulic lines and route the equalizer cables over the pulleys exactly as the drawing shows; a cable on the wrong side frays in weeks. Fit the overhead beam or floor plate and its shutoff. Fill the reservoir with AW32 hydraulic oil (not ATF unless the manual says so) and have your electrician connect the 220V feed on its own breaker.

5
Bleed, balance and test

Raise the empty lift a few times to purge air, adjust the equalizer cables so both sides lock at the same height, and listen for every safety lock clicking on the way up. Fit the arm restraints and pads, then test with a light car at 12 inches, 36 inches and full height, watching for drift over 5 minutes at each stop. Re-torque the anchors after the first week and every 6 months after.

Keep the packing list and the torque record with the manual. Warranty claims go faster with them.
Four-post liftStorage and service four-post lifts, 8,000 to 14,000 lb, with or without the caster kit
Time 4–6 hrsPeople 2Skill Moderate
1
Check the floor and the ceiling

Four-post lifts spread the load, so 4 inches of 3,000 PSI concrete is usually enough. Measure the ceiling to the lowest obstruction (door tracks and openers count): 10 feet works for most storage models. Confirm the bay is long enough for the runways plus the approach ramps, and that a 110V or 220V outlet is within reach of the power unit.

Hannah's tip for a 2-car garage: park the daily driver under the lift and the weekend car on top.
2
Set the posts and runways

Unpack and check the parts against the list. Stand the four posts roughly in place, then lift the runways onto the crossbeams with a helper and an engine hoist or a forklift. Measure the diagonals of the post layout and adjust until they match within 1/8 inch. Anchor if you are not using the caster kit; a free-standing four-post still needs the posts plumb and shimmed.

3
Cables, cylinder and power unit

Route the four lifting cables from the cylinder over the pulleys to each post exactly as the drawing shows, and set the cable tension so every corner locks at the same height. Mount the power unit, connect the hydraulic line, fill with AW32 and plug in or have the electrician wire it.

4
Run it empty, then load it

Cycle the lift fully a few times to purge air and confirm all four locks click together. Adjust the cable tension if one corner lags. Fit the ramps, wheel stops and drip trays, drive a car on, raise it to the first lock and check for drift over 5 minutes. Re-check the cable tension after the first week.

Always lower the lift onto its locks before walking away. Never leave a car hanging on the hydraulics.
Tire changer and wheel balancerSwing-arm and tilt-back tire changers, wheel balancers and changer + balancer combos
Time 1–2 hrsPeople 1–2Skill Basic
1
Uncrate and place it

Remove the crate and wrap and check the machine, mount head, bead breaker blade, cones and accessories against the packing list. Slide it off the pallet with a pallet jack or a helper. Give the tire changer about 3 feet of clear space on the bead breaker side and set the balancer on a flat, solid floor; a wobbly floor makes a balancer chase its tail.

2
Anchor and connect

Bolt the tire changer down through its base holes with the anchors supplied; the bead breaker puts real side load on it. Connect a compressor line rated for at least 110 to 145 PSI with a water separator, and fill the lubricator with air-tool oil. Plug the balancer into a grounded outlet, or have the electrician wire a 220V changer to its own circuit.

Most home-shop changers run on 110V. Check the plate before you call the electrician.
3
Set up and calibrate

Fit the mount head and the plastic rim protectors, and adjust the head clearance to the rim on a spare wheel per the manual. On the balancer, fit the shaft, cones and quick nut, then run the calibration routine with the supplied 100-gram weight so the readouts are true from the first wheel.

4
Do a practice wheel

Start with an old wheel and tire you do not care about. Break the bead, mount it on the table, demount and remount the tire with plenty of paste, then balance it. Keep hands clear of the bead breaker and the turntable clamps. Once that goes smoothly, you are ready for the real ones.

Zero-turn mower and lawn tractorJohn Deere and Cub Cadet zero-turns, riding mowers, lawn tractors and Gator UTVs
Time 30–60 minPeople 1Skill Basic
1
Uncrate and release the transport locks

Remove the crate and wrap and look for shipping damage. Bolt on the seat, steering wheel or lap bars if they shipped loose, then raise the roll bar and pin it upright. On a zero-turn, release the hydro bypass levers (set to freewheel for loading) so the drive wheels engage. Raise the deck to its transport height.

2
Oil, fuel, battery and tires

Engines usually ship with oil, but check the dipstick; too much is as bad as too little. Fill with fresh gasoline (87 octane or higher, no more than 10% ethanol), connect the battery, and set tire pressures to the label, often 10 to 14 PSI rear and 15 to 20 front. Check that the blades are tight and the deck belt sits on every pulley.

Level the deck side to side within 1/8" and set the front 1/4" lower than the rear for a clean cut.
3
Start, safety checks and first cut

Sit down, set the parking brake, levers out, start the engine. Confirm the seat switch kills the engine if you lift off with the blades engaged, and that the blades stop within 5 seconds of disengaging. Drive off the pallet with the deck up. Change the engine oil after the first 5 to 8 hours as the manual directs, then follow the normal schedule.

Gator UTVs and lawn tractors with a loader: work every control slowly through its full travel before the first job.
Forklift and pallet jackElectric and LPG forklifts, manual and electric pallet jacks, stackers
Time 30–90 minPeople 1–2Skill Basic
1
Uncrate and inspect

Cut the banding, remove the wrap and compare the machine, forks, keys, charger and manual against the packing list. Photograph the serial plate and hour meter. Check the mast chains, hoses, tires and fork heels for shipping damage and tell us within 24 hours if you find any.

2
Battery, fluids and charger

Electric models: connect the battery (positive first), check the electrolyte if it is a flooded battery, and give it a full first charge on the supplied charger before use. LPG models: check engine oil, hydraulic level and coolant, then fit a full cylinder and check the fitting for leaks with soapy water. Manual pallet jacks need only a quick check of the hydraulic pump and a few pumps of the handle.

Chargers for larger electric forklifts often need a 220V outlet. Plan the charging spot before delivery day.
3
Fit the forks and check the mast

Slide the forks onto the carriage, space them evenly for the pallets you handle and drop the locking pins. Grease the mast rails and chain, then raise and lower the empty mast fully a few times and tilt it both ways, watching for leaks and listening for anything that catches.

4
Drive off the pallet and test with a load

With the forks a few inches up and the mast tilted back, drive slowly off the pallet onto flat ground. Test the horn, lights, brake and seat switch. Lift a known load well under the rated capacity to the first shelf height and set it down. For the first 50 hours keep loads light, then do the first service in the manual to keep the warranty in force.

Pool heat pumpResidential heat pumps for in-ground and above-ground pools, 50,000 to 140,000 BTU
Time 2–4 hrsPeople 1–2Skill Moderate
1
Pick the spot

The unit sits outdoors on a level concrete pad or a heat pump base, after the filter and before any chlorinator in the plumbing line. It needs open air: about 24 inches clear on the sides and 5 feet above the fan, and nothing blowing cold exhaust straight back at the intake. Keep it within reach of the existing pool plumbing to save on pipe.

Do not tuck it under a deck or against a hedge. Airflow is what makes a heat pump work.
2
Plumb it in

With the pump off, cut into the return line after the filter and fit the supplied unions to the heat pump's in and out ports, using PVC and a bypass with three valves so you can isolate the unit for winter. Follow the flow arrows. Prime the system, open the valves, and check every joint for drips once the pool pump is running.

3
Electrical hookup

This is a job for a licensed electrician: a dedicated 220V circuit on the breaker size shown on the rating plate, a weatherproof disconnect within sight of the unit, and bonding to the pool's grounding grid as local code requires. The pool pump should be on a timer that runs while the heat pump is heating.

4
First start and settings

Run the pool pump first, then switch the heat pump on and set the target temperature. The fan starts, the compressor follows a minute or so later, and the outlet pipe should feel a few degrees warmer than the inlet. Expect a day or two to bring a pool up to temperature. Keep water chemistry balanced; high chlorine or low pH shortens the life of the heat exchanger.

Air temperature under about 50°F drops the output. In cold months, use a cover and run it in the warmer part of the day.
What to have on hand

Tools for the job

Socket and wrench set

SAE and metric, 3/8" and 1/2" drive, up to 1-1/4" or 32 mm for lift anchors and fork pins.

Torque wrench

1/2" drive, 30 to 250 ft-lb range. Every anchor, blade bolt and roll bar fastener has a number in the manual.

Rotary hammer drill

SDS-Plus with a 3/4" carbide bit for lift and tire changer anchors. A regular hammer drill struggles in cured slab.

4-ft level and tape measure

Plus a chalk line and a framing square. Layout accuracy decides how a lift runs for the next 20 years.

Engine hoist or a second person

Lift posts weigh 300 to 500 lb each. A hoist or two strong helpers to stand them safely.

Grease gun and fluids

Lithium grease, AW32 hydraulic oil, the engine oil grade in the manual, tire paste, fresh fuel.

Pry bar, cutters and a utility knife

For banding, crate panels and stretch wrap. A flat bar makes lining up pin holes painless.

Pallet jack or a helper

To move crated lifts, tire machines and heat pumps into place. Mowers, tractors and forklifts drive off on their own.

Safety gear

Safety glasses, cut-resistant gloves, closed-toe boots and hearing protection for the drill and the first start.

Manuals and guides

Ask for the documents

Two-post lift installation guidePDF · Floor requirements, layout dimensions, anchor torque table, cable routing drawings and the pre-use inspection sheet.
Request
Four-post and scissor lift guidePDF · Runway alignment, slab and ceiling specs, caster kit fitting, and the drift test procedure.
Request
Tire changer and balancer setup sheetPDF · Air supply specs, anchor pattern, mount head adjustment, balancer calibration steps and the first-wheel checklist.
Request
Mower, tractor, UTV and forklift first-start checklistPDF · Shipped-loose parts, fluid specs, tire pressures, deck leveling, battery charging and the hour-based service calendar for year one.
Request
Pool heat pump placement and plumbing guidePDF · Clearances, pad sizing, bypass plumbing diagram, electrical requirements for your electrician, and winterizing steps.
Request
Professional installation

Rather have it done for you?

We work with independent lift installers and equipment technicians across the 48 states. Tell Hannah your ZIP code and the model and she quotes a flat installation price before you order, or after delivery if you get halfway through and change your mind. No judgment.

Installers who know the brands

Insured, experienced with the lifts and machines we carry, and familiar with local anchoring and electrical codes.

One flat price

Covers labor, anchors and the final safety test. Electrical hookup is quoted separately by a licensed electrician.

Booked around delivery

We schedule the installer for the week after your freight lands so the crate is not sitting in your driveway.

Paperwork for the warranty

You get a signed installation and inspection report, which speeds up any future warranty claim.

Get an installation quote Call Hannah (706) 431-7885 Typical two-post lift installation: $450 to $900 depending on region. Mowers and tire machines rarely need it.
Lift-bay checklist

Is your garage lift-ready?

Tick each item that is true for your bay. If any stay unchecked, sort them out before the lift arrives; the two most expensive words in lift installation are "thin slab". Not sure about one? Send Hannah a photo and a couple of measurements.

0/8

Work through the list. Your progress is saved on this device.

Stuck on a step? Call Hannah.

Setup help is free for every customer, for the life of the machine. She will put a technician on the line. Mon–Fri 9AM–6PM EST.